loading
Hengbao: Leading maker of fire-rated glass & fire-resistant glazing system since 1998.

How To Design Fire-Rated Glass Partitions For Modern Office Interiors

Fire-rated glass partitions can bring daylight and visual connection to an office while helping maintain the fire compartments or protected routes required by a buildings fire strategy. Their performance, however, depends on more than the glass alone. The glass, framing, seals, fixings, doors, surrounding construction and installation details must form a compatible, tested system.

Because requirements vary by location and building, a partition should be designed and approved against the projects applicable codes and fire strategy. The guidance below can help architects, interior designers, contractors and building owners coordinate the key decisions.


Start with the Buildings Fire Strategy

Before selecting a partition system, establish what the partition is required to do. It may form part of a compartment boundary, protect an escape route, separate a higher-risk area or serve another function defined by the projects fire strategy. These roles can require different performance criteria.

Confirm with the projects fire-safety professional and relevant building authority:

  • The location and extent of the required fire-resisting boundary
  • The required fire-performance classification and duration, where applicable
  • Whether the system must provide integrity, insulation, or both
  • Whether smoke control is also required
  • How doors, openings and penetrations must be treated
  • Any requirements for access, escape routes or accessibility

Do not assume that a transparent partition is acceptable simply because it has a fire-resistance rating. Its location, size, supporting construction and relationship to other fire-safety measures all matter.


Distinguish Fire Resistance from Reaction to Fire

Fire resistance and reaction to fire describe different properties. In European classification systems, for example, A1, A2, B and C generally relate to reaction to firethe contribution a product makes to fire growth. They are not fire-resistance durations.

Fire resistance concerns how a construction element performs under a defined test and classification system. Depending on the applicable standard and the required function, criteria may address matters such as integrity and insulation. Ratings and terminology differ between jurisdictions; a rating under one test method should not automatically be treated as equivalent to a rating under another.

For a project, specify the required performance using the terminology and standards recognized by the local code. Ask the supplier for the classification, test or assessment documentation, and the exact scope of application for the proposed assembly.


Plan Fixed Panels and Openings Together

Develop the partition layout around the fire strategy, circulation routes and intended use of each space. Mark fixed panels, doors, junctions and interfaces with adjacent walls and ceilings on coordinated drawings.

Panel size and configuration must remain within the limits of the tested or assessed system. Maximum dimensions can depend on the glass type and thickness, frame, supports, fixings, exposure conditions and test evidence. A panel size used on one projector listed in a general product brochureshould not be assumed suitable for another.

Likewise, avoid treating common dimensions or rating durations as universal standards. Confirm allowable sizes and performance directly from the documentation for the specific system being proposed.


Select Doors as Part of the Assembly

A door opening can be a critical part of a fire-resisting partition. The door leaf, frame, glazing, seals, hardware, closer, threshold and installation details must be suitable for the required application and supported by relevant evidence.

Coordinate door locations with circulation and escape routes, and verify required clear widths, swing direction, accessibility and operating hardware against the projects applicable requirements. Where doors form part of a fire-resisting boundary, confirm whether they need to close automatically and how their operation is to be maintained.

Do not assume that a fire-rated door can be combined with any fire-rated screen. Confirm that the door and partition arrangement is covered by the relevant system documentation, including the junction between them.


Coordinate Frames, Junctions and Interfaces

Frame profiles affect appearance, structural support and the systems tested performance. The frame material, dimensions, anchorage and finish must be compatible with the specified glazing system. A slimmer profile or a different material may look similar but can fall outside the evidence for the tested assembly.

Pay particular attention to:

  • Glass-to-frame connections and required clearances
  • Panel-to-panel junctions and corner conditions
  • Head, sill and jamb details
  • Connections to floors, ceilings and adjacent walls
  • Movement joints and deflection allowances
  • Seals, gaskets, fixings and any required fire-stopping

Do not design these details from appearance alone. Use documented system details and resolve any proposed changes with the system supplier and the projects fire-safety team before fabrication.


Balance Daylight, Privacy and Acoustics

Transparent glazing can help distribute daylight and create visual connections, but it does not provide privacy or acoustic separation by default. Consider the needs of meeting rooms, focus areas, reception spaces and circulation routes when choosing clear, translucent, patterned or otherwise privacy-enhancing glazing.

Check that any change in glass type, applied film, coating or surface treatment is permitted by the systems documentation. Acoustic performance should also be specified and verified separately; a fire-resistance classification does not establish sound insulation.

Align glass joints, frames and door hardware with adjacent architectural elements where practical. Consistent module sizes and coordinated finishes can make the installation feel intentional without altering tested system details.


Resolve These Items Before Fabrication

A coordinated pre-fabrication package should identify:

  1. Design basis: applicable codes, fire strategy, required classifications and any smoke-control requirements.
  2. System evidence: the proposed systems test or assessment documentation, permitted scope and installation instructions.
  3. Drawings: overall elevations, plan locations, panel and opening dimensions, junctions and interfaces with the building.
  4. Doors and hardware: leaf and frame details, glazing, seals, closers, access requirements and coordination with the adjacent partition.
  5. Supporting construction: substrate type, fixing method, expected movement and any required fire-stopping.
  6. Finish schedule: frame finishes, glass appearance and any approved treatments.
  7. Installation and inspection: responsible installers, inspection points, handover documents and maintenance requirements.

Review deviations from the documented system before ordering materials. Changes to panel dimensions, framing, supports, hardware or junction details can affect whether the proposed evidence applies.


Verify Installation and Maintain the System

Even a suitable design can underperform if installed incorrectly. Installation should follow the system manufacturers instructions and project documentation. Record checks of framing, fixings, seals, glass condition, door operation and interfaces before the work is concealed or handed over, as appropriate to the project.

Provide building operators with the system documentation, inspection and maintenance instructions, and details of any restrictions on replacement components or modifications. Later changessuch as drilling into frames, adding films or replacing door hardwareshould be reviewed before they are made.


A Practical Route to a Compliant Design

The most reliable process is to define the partitions role in the fire strategy, select a system with evidence for the required application, coordinate the full assembly and interfaces, and confirm the final design with the relevant project professionals and authorities. Manufacturers can help interpret their system documentation, but their product information should be considered alongside the projects code requirements and independent fire-safety advice.

With that coordination in place, fire-rated glass partitions can support bright, connected office interiors while performing the specific safety function required of them.

Contact Us For Any Support Now
Table of Contents
GET IN TOUCH WITH Us
recommended articles
Case Resourse Industry News
Barra Transport Interchange, Macau
As a large integrated transit hub connecting light rail, buses and parking lots in Macau, Barra Transport Hub receives heavy passenger flow every day, with the central skylight serving as the landmark visual feature of the station. The fire rated skylight of the project fully adopts Fpos 21mm crystal silicon fire-resistant glass, which can provide 120-minute fire and thermal radiation resistance as well as 30-minute fire and heat insulation performance, meeting high fire safety standards for large public transport buildings. In case of fire, the glass interlayer foams rapidly and absorbs heat to form a dense fireproof barrier, effectively stopping the spread of flames and smoke and ensuring smooth evacuation for crowds. The glass boasts excellent UV resistance, free of yellowing or fogging after long-term use, maintaining high light transmittance to ease the dull atmosphere of large transit premises. With a minimalist and elegant outlook, the skylight satisfies rigid fire safety requirements while creating a bright and open modern transit space, balancing reliable protection and the aesthetic of public architecture.
Double Honors in One Night - Hengbao Company Wins Two Major Awards, Advancing with Prestige!
From November 3 to 4, the 27th China International Door & Window & Curtain Wall Technology Exchange Seminar and the 3rd National Door & Window Distributors Conference were grandly held in Shanghai.
 King Mongkut Chaokhunthahan Hospital
King Mongkut Chaokhunthahan Hospital is an integrated medical and research complex developed by Rajamangala University of Technology Thaipradit in Ratchaburi Province, Thailand. Located in the core area of the Eastern Economic Corridor (EEC), the building features a boundary-free modern design with extensive floor-to-ceiling glass panels combined with curved eaves, creating a spacious and serene therapeutic environment. Fire-resistant partitions and patient access corridors throughout the facility utilize EW120 fire rated doors made from 15 mm Fpos crystal silicon fire-resistant glass, which offer 120 minutes of fire integrity resistance and thermal radiation barrier performance. During fire exposure, the interlayer rapidly foams to absorb heat, effectively blocking smoke and residual heat, thereby ensuring comprehensive safety for patient and staff evacuation. The glass maintains high transparency under normal conditions without yellowing or fogging, perfectly complementing the hospital's minimalist and contemporary architectural facade. It balances robust fire resistance with visual clarity and aesthetic appeal, meeting both lighting requirements and stringent fire safety standards for medical spaces.
Galaxy Macau Resort
Galaxy Macau Resort is a massive, high-end integrated resort complex in Macau's Cotai City, featuring multiple five-star hotels, an exhibition center, and commercial spaces, with exceptionally stringent standards for fire safety and facade decoration. The project extensively employs 60mm fire rated glass to create EI120 fire rated partitions. This product exhibits stable fire resistance; upon exposure to fire, its interlayer rapidly foams to provide thermal insulation. It has passed 120-minute fire resistance tests and the hose stream test, complying with the ASTM E119 standard and fully meeting the fire safety requirements for high-end buildings in Hong Kong and Macau. The glass is transparent and clean, resistant to yellowing and fogging over prolonged use, with a simple yet elegant appearance. Its extensive application not only meets fire compartmentation safety requirements but also preserves natural lighting and overall facade aesthetics, achieving a perfect balance between fire safety, structural stability, and high-end architectural beauty.
Hamilton Alison Surgical Centre, Melbourne
Hamilton Alison Surgical Centre is a specialized private medical surgical facility in the region,with spatial zoning strictly compliant with Australian fire safety standards.It employsd to create integrated EI60 fire-rated doors as partition barriers.These components exhibit a fire resistance rating of up to 60minutes,maintaining structural integrity under fire while effectively blocking high-temperature radiation and toxic smoke,thereby precisely demarcating fire compartments and providing ample evacuation time for both medical staff and patients.The thermal insulation and fire resistance performance are stable and reliable.The reinforced composite glass structure is robust and impact-resistant,making it suitable for high-frequency usage scenarios in operating rooms and clinical areas.The glass offers excellent transparency and light transmission,enabling healthcare professionals to monitor all zones promptly without visual blind spots.Paired with a minimalist,lightweight metal frame,the design eliminates the oppressive weight associated with traditional walls,presenting a clean and sleek aesthetic that aligns with the requirements for tidy and transparent medical spaces.This configuration not only meets stringent fire safety regulations but also embodies a harmonious integration of safety and aesthetics.
United in Action, Building Safety Together - The Jiangmen Construction Engineering Fire Protection Industry Association Visited Hengbao Company to Explore New Collaboration Opportunities

To enhance technical exchanges in the construction fire safety sector, standardize the application of fire protection products, and promote high-quality industry development, the Jiangmen Construction Engineering Fire Protection Industry Association recently organized its member units to visit Guangdong Hengbao Fire Protection Technology Co., Ltd., where they conducted a field tour and attended a specialized technical seminar. Zou Zhao from the Fire Management Division of the Jiangmen Municipal Housing and Urban-Rural Development Bureau was invited to participate. Representatives from various stakeholders gathered to discuss technological innovation, establish industry standards, and strengthen building fire safety safeguards.
Macau Public Prosecutions Office Building (Phase II)
As an extended government space for judicial case handling, file storage and visitor inquiries, Macau Public Prosecutions Office Building (Phase II) features a steady and solemn design with a mild and elegant office atmosphere. Hengbao EI60 fire rated glass doors are adopted for all case-handling compartments and corridor passages. The glass is 25mm crystal silicon fire-resistant glass, and the door frames are finished with wood grain thermal transfer technology, reproducing delicate natural wood textures to avoid the cold and stiff look of ordinary steel frames, which well matches the low-key and grand decoration tone of government premises. The doors provide 60-minute integrated fire and heat insulation protection. In case of fire, the interlayer of the glass foams rapidly to block flames and smoke, leaving sufficient evacuation time for staff and visitors and complying with strict fire safety codes for Macau judicial buildings. The crystal-clear glass is free of fogging and color difference, facilitating cross-room inspection and communication, and perfectly combines reliable fire safety performance with the gentle and refined texture of judicial office spaces.
 Hazrat Shahjalal International Airport Expansion Project
The Bangladesh Hazrat Shahjalal International Airport expansion project,serving as a core transportation hub driving the nation's economic growth,employs 52mm insulated composite fire-resistant glass in its construction,seamlessly integrating international safety standards with modern architectural aesthetics.The EI120 fire rated glass partition made from this glass exhibit exceptional fire resistance and thermal insulation capabilities,effectively withstanding high temperatures and thermal radiation for up to two hours,providing a robust safety barrier for the airport's massive passenger flow.Additionally,the 52mm insulated composite structure is stable,impact-resistant,resistant to cracking,and highly durable.Paired with a sleek and sophisticated partition frame,the design achieves a visually minimalist yet elegant appearance,combining superior fire safety performance with visual transparency and aesthetic appeal,perfectly aligning with the airport's open,contemporary spatial layout.
The 315 Special Edition: A Pioneer in Enhancing Fire-Resistant Glass Quality – Hengbao Chen Wolin
Chen Wolins story is one of dedication and relentless commitment. For over two decades, he has specialized in the field of nano-silicon (crystalline silicon) fire-resistant glass, not only filling a technological gap in China but also driving progress across the entire industry.
Good news: The Hengbao EI60 and EI120 Fire Rated Doors with Partition Systems Have Obtained SIRIM Certification in Malaysia
Good news: Hengbao and Malaysia's Nanxing Glass Group have jointly developed the EI60 and EI120 fire rated door with partition system, which has successfully obtained SIRIM certification from the Malaysia Institute of Scientific Innovation and Industrial Research (SIRIM Berhad). This makes Hengbao the first company whose EI120 fire rated door with partition system has received SIRIM certification. The collaboration between Hengbao and Nanxing Glass Group marks a significant milestone in their shared success story!
Product Lives
Customer service